Novarly ParcelRenewable sites

Renewable sitesBillinge Hill Quarry Landfill Scheme

Billinge Hill Quarry Landfill Scheme

Billinge Hill Quarry Landfill Scheme is operational in St. Helens with a recorded capacity of 1 MW, and has been generating since 1998-04-03.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1998-04-03
Landfill Gas
Technology
Bidston Methane
St. Helens
Authority
England

Planning and build timeline

Application submitted1996-06-04
Permission granted1996-08-12
2 months after submission
Operational1998-04-03
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
PROMISED LAND FARM
Wind Onshore · Operational
11.5 km
Holiday Moss Landfill Gas Scheme
Landfill Gas · Operational
2.93.6 km
Holiday Moss Gas to Energy II
Landfill Gas · Operational
1.43.6 km
Sanko Gosei Solar Panels
Solar Photovoltaics · Operational
0.58 km
West Quarry
Landfill Gas · Operational
4.58.4 km
Unit 5 XL Business Park
Battery · Under Construction
49.98.6 km
IBL Cold Stores - Solar Photovoltaics Panels
Solar Photovoltaics · Operational
0.88.9 km
Kirkless Power
Landfill Gas · Operational
2.19.6 km

How big is Billinge Hill Quarry Landfill Scheme?

Billinge Hill Quarry Landfill Scheme has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Billinge Hill Quarry Landfill Scheme?

REPD records the operator as Bidston Methane. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Billinge Hill Quarry Landfill Scheme approved and built?

The application was submitted on 1996-06-04. Permission was granted on 1996-08-12, 2 months later. The site became operational on 1998-04-03, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 573.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council