Renewable sites › Goole Fields
Goole Fields
Goole Fields is an operational 32.8 MW onshore wind farm in East Riding of Yorkshire, generating since 11 August 2014. Planning permission was granted on 1 September 2003, 5 months after submission. Operator of record: RWE npower.
Planning and build timeline
| Application submitted | 1 April 2003 |
| Permission granted | 1 September 2003 5 months after submission |
| Operational | 11 August 2014 131 months after consent |
Screening a site of your own?
East Riding of Yorkshire approves 82% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Goole Fields’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Riding of Yorkshire’s record on onshore wind
East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 34.9 | 1.2 km |
Solar Photovoltaics · Operational | 5 | 4.5 km |
Wind Onshore · Operational | 44 | 5.7 km |
Wind Onshore · Operational | 28.7 | 6.5 km |
Battery · Operational | 40 | 7.9 km |
Wind Onshore · Operational | 3 | 8 km |
Wind Onshore · Operational | 24 | 8.1 km |
Wind Onshore · Operational | 33 | 9.5 km |
How big is Goole Fields?
Goole Fields has a recorded installed capacity of 32.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Goole Fields?
REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Goole Fields approved and built?
The application was submitted on 1 April 2003. Permission was granted on 1 September 2003, 5 months later. The site became operational on 11 August 2014, 131 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4373.
Novarly Parcel · official public data, read properly · parcel.novarly.com