Novarly ParcelRenewable sites

Renewable sitesNorth Moor Farm AD Plant (Farm AD)

North Moor Farm AD Plant (Farm AD)

North Moor Farm AD Plant (Farm AD) is operational in North Lincolnshire with a recorded capacity of 4 MW, and has been generating since 2014-04-01.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-04-01
Anaerobic Digestion
Technology
Rockscape Energy
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted2012-07-30
Permission granted2012-10-19
3 months after submission
Operational2014-04-01
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Keadby Wind Farm
Wind Onshore · Operational
684.6 km
Twin Rivers
Wind Onshore · Operational
28.78.2 km
Flixborough Industrial Estate
Solar Photovoltaics · Operational
58.3 km
Grange
Wind Onshore · Operational
12.39.4 km
Bagmoor
Wind Onshore · Operational
1610.3 km
Tween Bridge Windfarm
Wind Onshore · Operational
4410.8 km
Tudworth Field Road, Hatfield - Solar Panels
Solar Photovoltaics · Under Construction
0.1811.4 km
Tudworth Field Road, Hatfield - Solar PV Panels
Solar Photovoltaics · Operational
0.2711.4 km

How big is North Moor Farm AD Plant (Farm AD)?

North Moor Farm AD Plant (Farm AD) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Moor Farm AD Plant (Farm AD)?

REPD records the operator as Rockscape Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Moor Farm AD Plant (Farm AD) approved and built?

The application was submitted on 2012-07-30. Permission was granted on 2012-10-19, 3 months later. The site became operational on 2014-04-01, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 350.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council