Renewable sites › Hunstrete (Wilmington Farm)
Hunstrete (Wilmington Farm)
Hunstrete (Wilmington Farm) is an operational 2.3 MW solar farm in Bath and North East Somerset, generating since 30 December 2014. Planning permission was granted on 24 June 2014, 4 months after submission. Operator of record: Bath & West Community Energy Ltd.
Planning and build timeline
| Application submitted | 10 February 2014 |
| Permission granted | 24 June 2014 4 months after submission |
| Operational | 30 December 2014 6 months after consent |
Screening a site of your own?
Bath and North East Somerset approves 76% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hunstrete (Wilmington Farm)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Bath and North East Somerset
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bath and North East Somerset’s record on solar
Bath and North East Somerset has decided 17 solar farms and approved 76%, taking a median of 3.9 months. See every solar farm decision in Bath and North East Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 0.9 km |
Anaerobic Digestion · Under Construction | 2.2 | 4.6 km |
Landfill Gas · Operational | 6 | 6.9 km |
Battery · Under Construction | 6 | 7.1 km |
Anaerobic Digestion · Under Construction | 1 | 7.4 km |
Solar Photovoltaics · Operational | 6.5 | 8.1 km |
Solar Photovoltaics · Under Construction | — | 11 km |
Solar Photovoltaics · Operational | 0.25 | 11.3 km |
How big is Hunstrete (Wilmington Farm)?
Hunstrete (Wilmington Farm) has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hunstrete (Wilmington Farm)?
REPD records the operator as Bath & West Community Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hunstrete (Wilmington Farm) approved and built?
The application was submitted on 10 February 2014. Permission was granted on 24 June 2014, 4 months later. The site became operational on 30 December 2014, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2153.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode