Hunstrete (Wilmington Farm)

Hunstrete (Wilmington Farm) is operational in Bath and North East Somerset with a recorded capacity of 2.3 MW, and has been generating since 2014-12-30.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-30
Solar Photovoltaics
Technology
Bath & West Community Energy Ltd
Bath and North East Somerset
Authority
England

Planning and build timeline

Application submitted2014-02-10
Permission granted2014-06-24
4 months after submission
Operational2014-12-30
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bath and North East Somerset’s record on solar

Bath and North East Somerset has decided 17 solar farms and approved 76%, taking a median of 3.9 months. See every solar farm decision in Bath and North East Somerset

Other built sites within 15 km

SiteMWDistance
Chelwood Solar Farm
Solar Photovoltaics · Operational
50.9 km
Queen Charlton Quarry Renewable Energy Facility - food waste
Anaerobic Digestion · Under Construction
2.24.6 km
Langleys Lane - Electricity Generation Plant
Landfill Gas · Operational
66.9 km
Midsomer Norton - Battery Energy Storage System
Battery · Under Construction
67.1 km
Fosseway Environment Park
Anaerobic Digestion · Under Construction
17.4 km
SOLAR PARK - WHITCHURCH FARM
Solar Photovoltaics · Operational
6.58.1 km
Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels
Solar Photovoltaics · Under Construction
11 km
Hare Brewery - Solar Panels
Solar Photovoltaics · Operational
0.2511.3 km

How big is Hunstrete (Wilmington Farm)?

Hunstrete (Wilmington Farm) has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hunstrete (Wilmington Farm)?

REPD records the operator as Bath & West Community Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hunstrete (Wilmington Farm) approved and built?

The application was submitted on 2014-02-10. Permission was granted on 2014-06-24, 4 months later. The site became operational on 2014-12-30, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2153.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council