Hare Brewery - Solar Panels

Hare Brewery - Solar Panels is operational in South Gloucestershire with a recorded capacity of 0.25 MW, and has been generating since 2024-01-30.

0.25 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-01-30
Solar Photovoltaics
Technology
St Austell Brewery
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2019-07-05
Permission granted2019-08-08
1 months after submission
Operational2024-01-30
54 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Ring O Bells Farm
Solar Photovoltaics · Operational
56.4 km
Feeder Road
Battery · Operational
207 km
Queen Charlton Quarry Renewable Energy Facility - food waste
Anaerobic Digestion · Under Construction
2.27.9 km
Lockleaze Energy Storage
Battery · Operational
158.4 km
Amcor Flexibles
Solar Photovoltaics · Operational
1.79.2 km
Says Court Farm solar park
Solar Photovoltaics · Operational
19.89.4 km
Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels
Solar Photovoltaics · Under Construction
10.8 km
Grange Farm (Avon)
Solar Photovoltaics · Operational
2110.8 km

How big is Hare Brewery - Solar Panels?

Hare Brewery - Solar Panels has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hare Brewery - Solar Panels?

REPD records the operator as St Austell Brewery. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hare Brewery - Solar Panels approved and built?

The application was submitted on 2019-07-05. Permission was granted on 2019-08-08, 1 months later. The site became operational on 2024-01-30, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15732.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council