Hare Brewery - Solar Panels is an operational 0.25 MW solar farm in South Gloucestershire, generating since 30 January 2024. Planning permission was granted on 8 August 2019, 1 months after submission. Operator of record: St Austell Brewery.

0.25 MW
Capacity
as recorded in REPD
Operational
Status
since 30 January 2024
Solar Photovoltaics
Technology
St Austell Brewery
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted5 July 2019
Permission granted8 August 2019
1 months after submission
Operational30 January 2024
54 months after consent

Screening a site of your own?

RedlineUK · £39

South Gloucestershire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hare Brewery - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
56.4 km
Battery · Operational
207 km
Anaerobic Digestion · Under Construction
2.27.9 km
Battery · Operational
158.4 km
Solar Photovoltaics · Operational
1.79.2 km
Solar Photovoltaics · Operational
19.89.4 km
Solar Photovoltaics · Under Construction
10.8 km
Solar Photovoltaics · Operational
2110.8 km

How big is Hare Brewery - Solar Panels?

Hare Brewery - Solar Panels has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hare Brewery - Solar Panels?

REPD records the operator as St Austell Brewery. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hare Brewery - Solar Panels approved and built?

The application was submitted on 5 July 2019. Permission was granted on 8 August 2019, 1 months later. The site became operational on 30 January 2024, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15732.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode