Midsomer Norton - Battery Energy Storage System is a 6 MW battery storage site under construction in Bath and North East Somerset. Planning permission was granted on 21 December 2022, 17 months after submission. Operator of record: Conrad Energy (Developments) II Limited.
Planning and build timeline
| Application submitted | 9 July 2021 |
| Permission granted | 21 December 2022 17 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Bath and North East Somerset: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Midsomer Norton - Battery Energy Storage System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 6 | 2.7 km |
Solar Photovoltaics · Operational | 6.5 | 4.1 km |
Solar Photovoltaics · Operational | 5 | 7.1 km |
Solar Photovoltaics · Operational | 2.3 | 7.1 km |
Solar Photovoltaics · Operational | 1.5 | 7.1 km |
Anaerobic Digestion · Under Construction | 1 | 8.2 km |
Solar Photovoltaics · Under Construction | 1.78 | 8.4 km |
Solar Photovoltaics · Operational | 7 | 8.9 km |
How big is Midsomer Norton - Battery Energy Storage System?
Midsomer Norton - Battery Energy Storage System has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Midsomer Norton - Battery Energy Storage System?
REPD records the operator as Conrad Energy (Developments) II Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Midsomer Norton - Battery Energy Storage System approved and built?
The application was submitted on 9 July 2021. Permission was granted on 21 December 2022, 17 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11866.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode