Novarly ParcelRenewable sites

Renewable sitesQueen Charlton Quarry Renewable Energy Facility - food waste

Queen Charlton Quarry Renewable Energy Facility - food waste

Queen Charlton Quarry Renewable Energy Facility - food waste is a 2.2 MW anaerobic digestion plant under construction in Bath and North East Somerset. Planning permission was granted on 19 May 2014, 8 months after submission. Operator of record: RSM (formerly Resourceful Earth).

2.2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
RSM (formerly Resourceful Earth)
Bath and North East Somerset
Authority
England

Planning and build timeline

Application submitted25 September 2013
Permission granted19 May 2014
8 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bath and North East Somerset: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Queen Charlton Quarry Renewable Energy Facility - food waste’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.34.6 km
Solar Photovoltaics · Operational
54.8 km
Battery · Operational
206.8 km
Solar Photovoltaics · Operational
0.257.9 km
Solar Photovoltaics · Operational
0.258.9 km
Solar Photovoltaics · Under Construction
1.059.6 km
Anaerobic Digestion · Under Construction
110.1 km
Battery · Operational
1510.9 km

How big is Queen Charlton Quarry Renewable Energy Facility - food waste?

Queen Charlton Quarry Renewable Energy Facility - food waste has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Queen Charlton Quarry Renewable Energy Facility - food waste?

REPD records the operator as RSM (formerly Resourceful Earth). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Queen Charlton Quarry Renewable Energy Facility - food waste approved and built?

The application was submitted on 25 September 2013. Permission was granted on 19 May 2014, 8 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 302.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode