Novarly ParcelRenewable sites

Renewable sitesChelwood Solar Farm

Chelwood Solar Farm

Chelwood Solar Farm is an operational 5 MW solar farm in Bath and North East Somerset, generating since 10 December 2015. Planning permission was granted on 12 September 2014, 4 months after submission. Operator of record: Mongoose Energy Coop.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 10 December 2015
Solar Photovoltaics
Technology
Mongoose Energy Coop
Bath and North East Somerset
Authority
England

Planning and build timeline

Application submitted19 May 2014
Permission granted12 September 2014
4 months after submission
Operational10 December 2015
15 months after consent

Screening a site of your own?

RedlineUK · £39

Bath and North East Somerset approves 76% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chelwood Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bath and North East Somerset’s record on solar

Bath and North East Somerset has decided 17 solar farms and approved 76%, taking a median of 3.9 months. See every solar farm decision in Bath and North East Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.30.9 km
Anaerobic Digestion · Under Construction
2.24.8 km
Landfill Gas · Operational
66.5 km
Battery · Under Construction
67.1 km
Solar Photovoltaics · Operational
6.57.7 km
Anaerobic Digestion · Under Construction
18.2 km
Solar Photovoltaics · Operational
711.1 km
Wind Onshore · Operational
211.5 km

How big is Chelwood Solar Farm?

Chelwood Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelwood Solar Farm?

REPD records the operator as Mongoose Energy Coop. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelwood Solar Farm approved and built?

The application was submitted on 19 May 2014. Permission was granted on 12 September 2014, 4 months later. The site became operational on 10 December 2015, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2298.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode