Planning and build timeline
| Application submitted | 2024-08-08 |
| Permission granted | 2024-10-14 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Conservation area — Bath
- World Heritage Site — City of Bath
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bath and North East Somerset’s record on solar
Bath and North East Somerset has decided 17 solar farms and approved 76%, taking a median of 3.9 months. See every solar farm decision in Bath and North East Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
King Edwards School, North Road - Solar Panels Solar Photovoltaics · Under Construction | 0.22 | 0.9 km |
Fosseway Environment Park Anaerobic Digestion · Under Construction | 1 | 4.7 km |
Kingston Farm Solar Photovoltaics · Operational | 5 | 8.6 km |
Manor Farm (Wiltshire) Solar Photovoltaics · Operational | 6.3 | 9.9 km |
Trowle Common Solar Photovoltaics · Operational | 5 | 10.4 km |
Cockhill Solar Farm Solar Photovoltaics · Operational | 20 | 10.6 km |
Hare Brewery - Solar Panels Solar Photovoltaics · Operational | 0.25 | 10.8 km |
Hunstrete (Wilmington Farm) Solar Photovoltaics · Operational | 2.3 | 11 km |
How big is Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels?
REPD does not record an installed capacity for Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels.
Who operates Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels?
REPD records the operator as Bath & North East Somerset Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bath Sports And Leisure Centre, North Parade Road - Solar PV Panels approved and built?
The application was submitted on 2024-08-08. Permission was granted on 2024-10-14, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 17001.