Renewable sites › Highfields South Landfill Gas
Highfields South Landfill Gas
Highfields South Landfill Gas is an operational 1 MW landfill gas site in Walsall, generating since 27 September 2012. Planning permission was granted on 13 September 2012, 2 months after submission. Operator of record: Npower.
Planning and build timeline
| Application submitted | 20 July 2012 |
| Permission granted | 13 September 2012 2 months after submission |
| Operational | 27 September 2012 0 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Walsall: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Highfields South Landfill Gas’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 49 | 5.3 km |
Battery · Operational | 41 | 6.2 km |
Battery · Operational | 49.9 | 7.9 km |
Anaerobic Digestion · Operational | 6 | 8.4 km |
Battery · Operational | 2 | 9.3 km |
EfW Incineration · Under Construction | 2 | 10.1 km |
Battery · Operational | 57 | 11.2 km |
Solar Photovoltaics · Under Construction | 6.9 | 11.3 km |
How big is Highfields South Landfill Gas?
Highfields South Landfill Gas has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Highfields South Landfill Gas?
REPD records the operator as Npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Highfields South Landfill Gas approved and built?
The application was submitted on 20 July 2012. Permission was granted on 13 September 2012, 2 months later. The site became operational on 27 September 2012, 0 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 628.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode