EPSRC Willenhall

EPSRC Willenhall is an operational 2 MW battery storage site in Walsall, generating since 1 September 2014. REPD does not record the planning grant date. Operator of record: University of Sheffield/ Eon/ Uniper.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2014
Battery
Technology
University of Sheffield/ Eon/ Uniper
Walsall
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 September 2014

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Walsall: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with EPSRC Willenhall’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
6.92.6 km
Battery · Operational
413.3 km
EfW Incineration · Under Construction
24.1 km
EfW Incineration · Under Construction
494.1 km
Battery · Operational
44.3 km
EfW Incineration · Operational
84.8 km
Battery · Operational
575.1 km
Battery · Operational
49.97.7 km

How big is EPSRC Willenhall?

EPSRC Willenhall has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates EPSRC Willenhall?

REPD records the operator as University of Sheffield/ Eon/ Uniper. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was EPSRC Willenhall approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 September 2014.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6846.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode