EPSRC Willenhall is operational in Walsall with a recorded capacity of 2 MW, and has been generating since 2014-09-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2014-09-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bowmans Harbour Solar Farm Solar Photovoltaics · Under Construction | 6.9 | 2.6 km |
Bloxwich Battery Battery · Operational | 41 | 3.3 km |
Wednesbury EfW Incineration · Under Construction | 2 | 4.1 km |
BH Energy Gap - Waste Energy Plant, The 3Rs EfW Incineration · Under Construction | 49 | 4.1 km |
Anchor Lane Energy Centre Battery · Operational | 4 | 4.3 km |
Wolverhampton EfW EfW Incineration · Operational | 8 | 4.8 km |
Golds Hill - Battery Storage Battery · Operational | 57 | 5.1 km |
Bustleholme Substation Battery · Operational | 49.9 | 7.7 km |
How big is EPSRC Willenhall?
EPSRC Willenhall has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates EPSRC Willenhall?
REPD records the operator as University of Sheffield/ Eon/ Uniper. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was EPSRC Willenhall approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-09-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6846.