Bloxwich Battery
Bloxwich Battery is an operational 41 MW battery storage site in Walsall, generating since 1 July 2019. Planning permission was granted on 11 February 2022, 64 months after submission. Operator of record: Gresham House Energy Storage.
Planning and build timeline
| Application submitted | 30 September 2016 |
| Permission granted | 11 February 2022 64 months after submission |
| Operational | 1 July 2019 |
Screening a site of your own?
Redline runs the record on your own boundary in Walsall: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bloxwich Battery’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 49 | 2.1 km |
Battery · Operational | 2 | 3.3 km |
EfW Incineration · Under Construction | 2 | 4.4 km |
Battery · Operational | 49.9 | 5.5 km |
Battery · Operational | 57 | 5.6 km |
Solar Photovoltaics · Under Construction | 6.9 | 5.7 km |
Landfill Gas · Operational | 1 | 6.2 km |
Battery · Operational | 4 | 6.9 km |
How big is Bloxwich Battery?
Bloxwich Battery has a recorded installed capacity of 41 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bloxwich Battery?
REPD records the operator as Gresham House Energy Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bloxwich Battery approved and built?
The application was submitted on 30 September 2016. Permission was granted on 11 February 2022, 64 months later. The site became operational on 1 July 2019.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8160.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode