BH Energy Gap - Waste Energy Plant, The 3Rs
BH Energy Gap - Waste Energy Plant, The 3Rs is under construction in Walsall with a recorded capacity of 49 MW.
Planning and build timeline
| Application submitted | 2019-09-09 |
| Permission granted | 2020-11-26 15 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bloxwich Battery Battery · Operational | 41 | 2.1 km |
EPSRC Willenhall Battery · Operational | 2 | 4.1 km |
Highfields South Landfill Gas Landfill Gas · Operational | 1 | 5.3 km |
Bowmans Harbour Solar Farm Solar Photovoltaics · Under Construction | 6.9 | 6 km |
Wednesbury EfW Incineration · Under Construction | 2 | 6.4 km |
Bustleholme Substation Battery · Operational | 49.9 | 7.1 km |
Golds Hill - Battery Storage Battery · Operational | 57 | 7.6 km |
Wolverhampton EfW EfW Incineration · Operational | 8 | 7.9 km |
How big is BH Energy Gap - Waste Energy Plant, The 3Rs?
BH Energy Gap - Waste Energy Plant, The 3Rs has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates BH Energy Gap - Waste Energy Plant, The 3Rs?
REPD records the operator as BH EnergyGap. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was BH Energy Gap - Waste Energy Plant, The 3Rs approved and built?
The application was submitted on 2019-09-09. Permission was granted on 2020-11-26, 15 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12292.