Wednesbury is under construction in Sandwell with a recorded capacity of 2 MW.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Kew Technologies (formerly JCB Broadcrown)
Sandwell
Authority
England

Planning and build timeline

Application submitted2014-12-31
Permission granted2015-03-25
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Golds Hill - Battery Storage
Battery · Operational
571.2 km
Oldbury
Advanced Conversion Technologies · Operational
404 km
EPSRC Willenhall
Battery · Operational
24.1 km
Anchor Lane Energy Centre
Battery · Operational
44.1 km
Bloxwich Battery
Battery · Operational
414.4 km
Bustleholme Substation
Battery · Operational
49.94.9 km
DPD Distribution Centre
Solar Photovoltaics · Operational
15.3 km
Kelvin Energy Recovery Facility
EfW Incineration · Under Construction
475.5 km

How big is Wednesbury?

Wednesbury has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wednesbury?

REPD records the operator as Kew Technologies (formerly JCB Broadcrown). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wednesbury approved and built?

The application was submitted on 2014-12-31. Permission was granted on 2015-03-25, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5030.