Golds Hill - Battery Storage

Golds Hill - Battery Storage is an operational 57 MW battery storage site in Sandwell, generating since 1 January 2024. Planning permission was granted on 11 August 2021, 3 months after submission. Operator of record: Constantine Energy Storage ltd.

57 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2024
Battery
Technology
Constantine Energy Storage ltd
Sandwell
Authority
England

Planning and build timeline

Application submitted20 May 2021
Permission granted11 August 2021
3 months after submission
Operational1 January 2024
29 months after consent

Screening a site of your own?

RedlineUK · £39

Sandwell approves 92% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Golds Hill - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Sandwell’s record on battery storage

Sandwell has decided 13 battery storage schemes and approved 92%, taking a median of 2.6 months. See every battery storage scheme decision in Sandwell

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Under Construction
21.2 km
Advanced Conversion Technologies · Operational
402.8 km
Battery · Operational
44 km
Solar Photovoltaics · Operational
14.2 km
EfW Incineration · Under Construction
474.6 km
EfW Incineration · Under Construction
474.6 km
Battery · Operational
25.1 km
Battery · Operational
49.95.3 km

How big is Golds Hill - Battery Storage?

Golds Hill - Battery Storage has a recorded installed capacity of 57 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Golds Hill - Battery Storage?

REPD records the operator as Constantine Energy Storage ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Golds Hill - Battery Storage approved and built?

The application was submitted on 20 May 2021. Permission was granted on 11 August 2021, 3 months later. The site became operational on 1 January 2024, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9183.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode