Bowmans Harbour Solar Farm is under construction in Wolverhampton with a recorded capacity of 6.9 MW.

6.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Wolverhampton City Council
Wolverhampton
Authority
England

Planning and build timeline

Application submitted2020-11-30
Permission granted2022-04-08
16 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wolverhampton’s record on solar

Wolverhampton has decided 11 solar farms and approved 100%, taking a median of 1.1 months. See every solar farm decision in Wolverhampton

Other built sites within 15 km

SiteMWDistance
Wolverhampton EfW
EfW Incineration · Operational
82.1 km
EPSRC Willenhall
Battery · Operational
22.6 km
Anchor Lane Energy Centre
Battery · Operational
44.5 km
Jaguar Land Rover
Solar Photovoltaics · Operational
5.85.6 km
Bloxwich Battery
Battery · Operational
415.7 km
BH Energy Gap - Waste Energy Plant, The 3Rs
EfW Incineration · Under Construction
496 km
Wednesbury
EfW Incineration · Under Construction
26.2 km
Land East of Lawn Lane
Solar Photovoltaics · Operational
56.3 km

How big is Bowmans Harbour Solar Farm?

Bowmans Harbour Solar Farm has a recorded installed capacity of 6.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bowmans Harbour Solar Farm?

REPD records the operator as Wolverhampton City Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bowmans Harbour Solar Farm approved and built?

The application was submitted on 2020-11-30. Permission was granted on 2022-04-08, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9527.