Bowmans Harbour Solar Farm
Bowmans Harbour Solar Farm is a 6.9 MW solar farm under construction in Wolverhampton. Planning permission was granted on 8 April 2022, 16 months after submission. Operator of record: Wolverhampton City Council.
Planning and build timeline
| Application submitted | 30 November 2020 |
| Permission granted | 8 April 2022 16 months after submission |
| Operational | not recorded |
Screening a site of your own?
Wolverhampton approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bowmans Harbour Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wolverhampton’s record on solar
Wolverhampton has decided 11 solar farms and approved 100%, taking a median of 1.1 months. See every solar farm decision in Wolverhampton →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 8 | 2.1 km |
Battery · Operational | 2 | 2.6 km |
Battery · Operational | 4 | 4.5 km |
Solar Photovoltaics · Operational | 5.8 | 5.6 km |
Battery · Operational | 41 | 5.7 km |
EfW Incineration · Under Construction | 49 | 6 km |
EfW Incineration · Under Construction | 2 | 6.2 km |
Solar Photovoltaics · Operational | 5 | 6.3 km |
How big is Bowmans Harbour Solar Farm?
Bowmans Harbour Solar Farm has a recorded installed capacity of 6.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bowmans Harbour Solar Farm?
REPD records the operator as Wolverhampton City Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bowmans Harbour Solar Farm approved and built?
The application was submitted on 30 November 2020. Permission was granted on 8 April 2022, 16 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9527.