Renewable sites › Bidston Moss Landfill Scheme
Bidston Moss Landfill Scheme
Bidston Moss Landfill Scheme is operational in Wirral with a recorded capacity of 2.3 MW, and has been generating since 1998-01-19.
Planning and build timeline
| Application submitted | 1997-11-03 |
| Permission granted | 1997-12-15 1 months after submission |
| Operational | 1998-01-19 1 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — Wirral
- Local nature reserve — BIDSTON MOSS
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Burbo Bank Energy Storage Battery · Operational | 2 | 1.4 km |
Port of Liverpool - wind Wind Onshore · Operational | 10 | 6.4 km |
Royal Seaforth Dock Wind Farm Wind Onshore · Operational | 3 | 6.6 km |
Hawthorne Road Battery · Under Construction | 20 | 8.1 km |
Bromborough Dock Landfill Scheme Landfill Gas · Operational | 3 | 8.8 km |
Bromborough Dock Landfill Gas · Operational | 3.7 | 9.4 km |
Land at Carnegie Road Battery · Operational | 20 | 9.9 km |
Lister Drive Battery · Operational | 49.9 | 9.9 km |
How big is Bidston Moss Landfill Scheme?
Bidston Moss Landfill Scheme has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bidston Moss Landfill Scheme?
REPD records the operator as Bidston Methane Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bidston Moss Landfill Scheme approved and built?
The application was submitted on 1997-11-03. Permission was granted on 1997-12-15, 1 months later. The site became operational on 1998-01-19, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 551.