Novarly ParcelRenewable sites

Renewable sitesGrange Farm (Avon)

Grange Farm (Avon)

Grange Farm (Avon) is operational in South Gloucestershire with a recorded capacity of 21 MW, and has been generating since 2014-12-11.

21 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-11
Solar Photovoltaics
Technology
Solar Power South
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2013-10-17
Permission granted2014-01-06
3 months after submission
Operational2014-12-11
11 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Hammond Court Farm
Solar Photovoltaics · Operational
150.6 km
Perrinpit Farm
Solar Photovoltaics · Under Construction
49.91.9 km
Amcor Flexibles
Solar Photovoltaics · Operational
1.71.9 km
Parklands
Solar Photovoltaics · Operational
4.62.8 km
Rolls Royce Filton Campus Building 185
Solar Photovoltaics · Operational
1.83.8 km
Rolls Royce Filton Campus Building 184
Solar Photovoltaics · Operational
1.43.8 km
Alveston Wind Park
Wind Onshore · Operational
6.94 km
Oakham Farm
Solar Photovoltaics · Operational
84 km

How big is Grange Farm (Avon)?

Grange Farm (Avon) has a recorded installed capacity of 21 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grange Farm (Avon)?

REPD records the operator as Solar Power South. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grange Farm (Avon) approved and built?

The application was submitted on 2013-10-17. Permission was granted on 2014-01-06, 3 months later. The site became operational on 2014-12-11, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1914.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council