Novarly ParcelRenewable sites

Renewable sitesFeeder Road

Feeder Road

Feeder Road is an operational 20 MW battery storage site in Bristol, City of, generating since 1 May 2023. Planning permission was granted on 19 March 2020, 6 months after submission. Operator of record: Thrive Renewables.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2023
Battery
Technology
Thrive Renewables
Bristol, City of
Authority
England

Planning and build timeline

Application submitted3 October 2019
Permission granted19 March 2020
6 months after submission
Operational1 May 2023
37 months after consent

Screening a site of your own?

RedlineUK · £39

Bristol, City of approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Feeder Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on battery storage

Bristol, City of has decided 8 battery storage schemes and approved 100%, taking a median of 2.3 months. See every battery storage scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Battery · Operational
154.2 km
Solar Photovoltaics · Operational
0.254.5 km
Solar Photovoltaics · Under Construction
1.055.7 km
Anaerobic Digestion · Under Construction
2.26.8 km
Solar Photovoltaics · Operational
0.257 km
Solar Photovoltaics · Operational
1.88.6 km
Solar Photovoltaics · Operational
1.48.6 km
Solar Photovoltaics · Operational
1.78.8 km

How big is Feeder Road?

Feeder Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Feeder Road?

REPD records the operator as Thrive Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Feeder Road approved and built?

The application was submitted on 3 October 2019. Permission was granted on 19 March 2020, 6 months later. The site became operational on 1 May 2023, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7663.

Novarly Parcel · official public data, read properly · parcel.novarly.com