Novarly ParcelRenewable sites

Renewable sitesFeeder Road

Feeder Road

Feeder Road is operational in Bristol, City of with a recorded capacity of 20 MW, and has been generating since 2023-05-01.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-05-01
Battery
Technology
Thrive Renewables
Bristol, City of
Authority
England

Planning and build timeline

Application submitted2019-10-03
Permission granted2020-03-19
6 months after submission
Operational2023-05-01
37 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on battery storage

Bristol, City of has decided 8 battery storage schemes and approved 100%, taking a median of 2.3 months. See every battery storage scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Lockleaze Energy Storage
Battery · Operational
154.2 km
Great Western Air Ambulance Charity - Solar Panels
Solar Photovoltaics · Operational
0.254.5 km
Epic Long Ashton, Phase 1 - 3 Office Buildings
Solar Photovoltaics · Under Construction
1.055.7 km
Queen Charlton Quarry Renewable Energy Facility - food waste
Anaerobic Digestion · Under Construction
2.26.8 km
Hare Brewery - Solar Panels
Solar Photovoltaics · Operational
0.257 km
Rolls Royce Filton Campus Building 185
Solar Photovoltaics · Operational
1.88.6 km
Rolls Royce Filton Campus Building 184
Solar Photovoltaics · Operational
1.48.6 km
Amcor Flexibles
Solar Photovoltaics · Operational
1.78.8 km

How big is Feeder Road?

Feeder Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Feeder Road?

REPD records the operator as Thrive Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Feeder Road approved and built?

The application was submitted on 2019-10-03. Permission was granted on 2020-03-19, 6 months later. The site became operational on 2023-05-01, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7663.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council