Renewable sitesAmcor Flexibles

Amcor Flexibles

Amcor Flexibles is operational in South Gloucestershire with a recorded capacity of 1.7 MW, and has been generating since 2015-11-01.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-11-01
Solar Photovoltaics
Technology
Langley Eco
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2015-06-02
Permission granted2015-07-09
1 months after submission
Operational2015-11-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Hammond Court Farm
Solar Photovoltaics · Operational
151.9 km
Grange Farm (Avon)
Solar Photovoltaics · Operational
211.9 km
Rolls Royce Filton Campus Building 184
Solar Photovoltaics · Operational
1.43.1 km
Rolls Royce Filton Campus Building 185
Solar Photovoltaics · Operational
1.83.1 km
Perrinpit Farm
Solar Photovoltaics · Under Construction
49.93.3 km
Parklands
Solar Photovoltaics · Operational
4.64.3 km
Oakham Farm
Solar Photovoltaics · Operational
84.5 km
Lockleaze Energy Storage
Battery · Operational
155.2 km

How big is Amcor Flexibles?

Amcor Flexibles has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Amcor Flexibles?

REPD records the operator as Langley Eco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Amcor Flexibles approved and built?

The application was submitted on 2015-06-02. Permission was granted on 2015-07-09, 1 months later. The site became operational on 2015-11-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5312.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council