Ring O Bells Farm

Ring O Bells Farm is an operational 5 MW solar farm in South Gloucestershire, generating since 18 August 2016. Planning permission was granted on 7 August 2015, 13 months after submission. Operator of record: Green Energy UK Direct.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 18 August 2016
Solar Photovoltaics
Technology
Green Energy UK Direct
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted26 June 2014
Permission granted7 August 2015
13 months after submission
Operational18 August 2016
12 months after consent

Screening a site of your own?

RedlineUK · £39

South Gloucestershire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ring O Bells Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
19.86.2 km
Solar Photovoltaics · Operational
0.256.4 km
Solar Photovoltaics · Under Construction
49.99.4 km
Solar Photovoltaics · Operational
1.79.8 km
Solar Photovoltaics · Operational
2110.4 km
Solar Photovoltaics · Operational
1510.9 km
Solar Photovoltaics · Operational
7011.4 km
Battery · Operational
49.511.4 km

How big is Ring O Bells Farm?

Ring O Bells Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ring O Bells Farm?

REPD records the operator as Green Energy UK Direct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ring O Bells Farm approved and built?

The application was submitted on 26 June 2014. Permission was granted on 7 August 2015, 13 months later. The site became operational on 18 August 2016, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2020.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode