Lockleaze Energy Storage

Lockleaze Energy Storage is an operational 15 MW battery storage site in Bristol, City of, generating since 1 December 2017. REPD does not record the planning grant date. Operator of record: Aura Power.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2017
Battery
Technology
Aura Power
Bristol, City of
Authority
England

Planning and build timeline

Application submitted10 March 2017
Permission grantednot recorded
Operational1 December 2017

Screening a site of your own?

RedlineUK · £39

Bristol, City of approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lockleaze Energy Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on battery storage

Bristol, City of has decided 8 battery storage schemes and approved 100%, taking a median of 2.3 months. See every battery storage scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Battery · Operational
204.2 km
Solar Photovoltaics · Operational
1.44.4 km
Solar Photovoltaics · Operational
1.84.4 km
Solar Photovoltaics · Operational
1.75.2 km
Solar Photovoltaics · Operational
0.256.4 km
Solar Photovoltaics · Operational
156.6 km
Solar Photovoltaics · Operational
86.8 km
Solar Photovoltaics · Under Construction
3.816.8 km

How big is Lockleaze Energy Storage?

Lockleaze Energy Storage has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lockleaze Energy Storage?

REPD records the operator as Aura Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lockleaze Energy Storage approved and built?

The application was submitted on 10 March 2017. REPD does not record a grant date. The site became operational on 1 December 2017.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6961.