Renewable sites › Lockleaze Energy Storage
Lockleaze Energy Storage
Lockleaze Energy Storage is operational in Bristol, City of with a recorded capacity of 15 MW, and has been generating since 2017-12-01.
Planning and build timeline
| Application submitted | 2017-03-10 |
| Permission granted | not recorded |
| Operational | 2017-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bristol, City of’s record on battery storage
Bristol, City of has decided 8 battery storage schemes and approved 100%, taking a median of 2.3 months. See every battery storage scheme decision in Bristol, City of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Feeder Road Battery · Operational | 20 | 4.2 km |
Rolls Royce Filton Campus Building 184 Solar Photovoltaics · Operational | 1.4 | 4.4 km |
Rolls Royce Filton Campus Building 185 Solar Photovoltaics · Operational | 1.8 | 4.4 km |
Amcor Flexibles Solar Photovoltaics · Operational | 1.7 | 5.2 km |
Great Western Air Ambulance Charity - Solar Panels Solar Photovoltaics · Operational | 0.25 | 6.4 km |
Hammond Court Farm Solar Photovoltaics · Operational | 15 | 6.6 km |
Oakham Farm Solar Photovoltaics · Operational | 8 | 6.8 km |
Moorhouse Farm, Moorhouse Lane - Solar Park Solar Photovoltaics · Under Construction | 3.81 | 6.8 km |
How big is Lockleaze Energy Storage?
Lockleaze Energy Storage has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lockleaze Energy Storage?
REPD records the operator as Aura Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lockleaze Energy Storage approved and built?
The application was submitted on 2017-03-10. REPD does not record a grant date. The site became operational on 2017-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6961.