Hangmans Lane is under construction in Malvern Hills with a recorded capacity of 5 MW.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Private Developer
Malvern Hills
Authority
England

Planning and build timeline

Application submitted2015-07-13
Permission granted2016-10-11
15 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Haven
Wind Onshore · Operational
1.26.2 km
Croome Airfield Solar Farm
Solar Photovoltaics · Operational
49.96.3 km
Glebe Farm Solar Farm
Solar Photovoltaics · Operational
327.2 km
Lower Strensham, Bourne Road (Extension)
Solar Photovoltaics · Operational
87.4 km
Otherton Farm
Solar Photovoltaics · Operational
410.5 km
Norton Fields Farm
Wind Onshore · Operational
1.310.6 km
Henwick Grove - Solar Panels
Solar Photovoltaics · Operational
11.5 km
Moog Controls Factory
Solar Photovoltaics · Operational
0.3814.1 km

How big is Hangmans Lane?

Hangmans Lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hangmans Lane?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hangmans Lane approved and built?

The application was submitted on 2015-07-13. Permission was granted on 2016-10-11, 15 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6258.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council