Norton Fields Farm is an operational 1.3 MW onshore wind farm in Wychavon, generating since 15 September 2015. Planning permission was granted on 3 December 2014, 5 months after submission. Operator of record: REsense c/o CO2Sense.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 15 September 2015
Wind Onshore
Technology
REsense c/o CO2Sense
Wychavon
Authority
England

Planning and build timeline

Application submitted18 July 2014
Permission granted3 December 2014
5 months after submission
Operational15 September 2015
9 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Wychavon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Norton Fields Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
56.7 km
Solar Photovoltaics · Operational
97.5 km
Solar Photovoltaics · Operational
7.8 km
Landfill Gas · Operational
3.48.4 km
Solar Photovoltaics · Operational
49.98.5 km
Solar Photovoltaics · Under Construction
309.6 km
Solar Photovoltaics · Operational
410.1 km
Solar Photovoltaics · Operational
810.2 km

How big is Norton Fields Farm?

Norton Fields Farm has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Norton Fields Farm?

REPD records the operator as REsense c/o CO2Sense. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Norton Fields Farm approved and built?

The application was submitted on 18 July 2014. Permission was granted on 3 December 2014, 5 months later. The site became operational on 15 September 2015, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4497.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode