Lower Strensham, Bourne Road (Extension)

Lower Strensham, Bourne Road (Extension) is an operational 8 MW solar farm in Wychavon, generating since 1 January 2021. Planning permission was granted on 23 October 2019, 3 months after submission. Operator of record: NextEnergy Capital LLP.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2021
Solar Photovoltaics
Technology
NextEnergy Capital LLP
Wychavon
Authority
England

Planning and build timeline

Application submitted25 July 2019
Permission granted23 October 2019
3 months after submission
Operational1 January 2021
14 months after consent

Screening a site of your own?

RedlineUK · £39

Wychavon approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lower Strensham, Bourne Road (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
320.5 km
Solar Photovoltaics · Operational
49.91.9 km
EfW Incineration · Under Construction
57.4 km
Solar Photovoltaics · Operational
0.388.5 km
Wind Onshore · Operational
1.310.2 km
Landfill Gas · Operational
3.410.3 km
Solar Photovoltaics · Operational
511.1 km
Solar Photovoltaics · Operational
911.8 km

How big is Lower Strensham, Bourne Road (Extension)?

Lower Strensham, Bourne Road (Extension) has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lower Strensham, Bourne Road (Extension)?

REPD records the operator as NextEnergy Capital LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lower Strensham, Bourne Road (Extension) approved and built?

The application was submitted on 25 July 2019. Permission was granted on 23 October 2019, 3 months later. The site became operational on 1 January 2021, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7423.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode