Glebe Farm Solar Farm is operational in Wychavon with a recorded capacity of 32 MW, and has been generating since 2021-03-01.

32 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-03-01
Solar Photovoltaics
Technology
NextEnergy Capital LLP
Wychavon
Authority
England

Planning and build timeline

Application submitted2015-05-21
Permission granted2015-10-21
5 months after submission
Operational2021-03-01
64 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Lower Strensham, Bourne Road (Extension)
Solar Photovoltaics · Operational
80.5 km
Croome Airfield Solar Farm
Solar Photovoltaics · Operational
49.92.2 km
Hangmans Lane
EfW Incineration · Under Construction
57.2 km
Moog Controls Factory
Solar Photovoltaics · Operational
0.388.3 km
Norton Fields Farm
Wind Onshore · Operational
1.310.6 km
Hill and Moor Landfill Scheme
Landfill Gas · Operational
3.410.8 km
Rotherdale Farm
Solar Photovoltaics · Operational
511.7 km
Rotherdale Farm - extension
Solar Photovoltaics · Operational
912.3 km

How big is Glebe Farm Solar Farm?

Glebe Farm Solar Farm has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glebe Farm Solar Farm?

REPD records the operator as NextEnergy Capital LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glebe Farm Solar Farm approved and built?

The application was submitted on 2015-05-21. Permission was granted on 2015-10-21, 5 months later. The site became operational on 2021-03-01, 64 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5480.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council