Renewable sites › Henwick Grove - Solar Panels
Henwick Grove - Solar Panels
Henwick Grove - Solar Panels is operational in Worcester, and has been generating since 2021-11-28.
Planning and build timeline
| Application submitted | 2021-09-03 |
| Permission granted | 2022-01-07 4 months after submission |
| Operational | 2021-11-28 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Otherton Farm Solar Photovoltaics · Operational | 4 | 3.2 km |
Norton Fields Farm Wind Onshore · Operational | 1.3 | 7.8 km |
The Haven Wind Onshore · Operational | 1.2 | 9.2 km |
Hangmans Lane EfW Incineration · Under Construction | 5 | 11.5 km |
Croome Airfield Solar Farm Solar Photovoltaics · Operational | 49.9 | 13.5 km |
Rotherdale Farm Solar Photovoltaics · Operational | 5 | 14.3 km |
EnviRecover EfW Incineration · Operational | 15.5 | 14.5 km |
How big is Henwick Grove - Solar Panels?
REPD does not record an installed capacity for Henwick Grove - Solar Panels.
Who operates Henwick Grove - Solar Panels?
REPD records the operator as University of Worcester. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Henwick Grove - Solar Panels approved and built?
The application was submitted on 2021-09-03. Permission was granted on 2022-01-07, 4 months later. The site became operational on 2021-11-28.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9629.
Novarly Parcel · official public data, read properly · parcel.novarly.com