Henwick Grove - Solar Panels is an operational solar farm in Worcester, generating since 28 November 2021. Planning permission was granted on 7 January 2022, 4 months after submission. Operator of record: University of Worcester.

Capacity
as recorded in REPD
Operational
Status
since 28 November 2021
Solar Photovoltaics
Technology
University of Worcester
Worcester
Authority
England

Planning and build timeline

Application submitted3 September 2021
Permission granted7 January 2022
4 months after submission
Operational28 November 2021

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Worcester: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Henwick Grove - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
43.2 km
Wind Onshore · Operational
1.37.8 km
Wind Onshore · Operational
1.29.2 km
EfW Incineration · Under Construction
511.5 km
Solar Photovoltaics · Operational
49.913.5 km
Solar Photovoltaics · Operational
514.3 km
EfW Incineration · Operational
15.514.5 km

How big is Henwick Grove - Solar Panels?

REPD does not record an installed capacity for Henwick Grove - Solar Panels.

Who operates Henwick Grove - Solar Panels?

REPD records the operator as University of Worcester. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Henwick Grove - Solar Panels approved and built?

The application was submitted on 3 September 2021. Permission was granted on 7 January 2022, 4 months later. The site became operational on 28 November 2021.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9629.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode