Novarly ParcelRenewable sites

Renewable sitesHenwick Grove - Solar Panels

Henwick Grove - Solar Panels

Henwick Grove - Solar Panels is operational in Worcester, and has been generating since 2021-11-28.

Capacity
as recorded in REPD
Operational
Status
since 2021-11-28
Solar Photovoltaics
Technology
University of Worcester
Worcester
Authority
England

Planning and build timeline

Application submitted2021-09-03
Permission granted2022-01-07
4 months after submission
Operational2021-11-28

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Otherton Farm
Solar Photovoltaics · Operational
43.2 km
Norton Fields Farm
Wind Onshore · Operational
1.37.8 km
The Haven
Wind Onshore · Operational
1.29.2 km
Hangmans Lane
EfW Incineration · Under Construction
511.5 km
Croome Airfield Solar Farm
Solar Photovoltaics · Operational
49.913.5 km
Rotherdale Farm
Solar Photovoltaics · Operational
514.3 km
EnviRecover
EfW Incineration · Operational
15.514.5 km

How big is Henwick Grove - Solar Panels?

REPD does not record an installed capacity for Henwick Grove - Solar Panels.

Who operates Henwick Grove - Solar Panels?

REPD records the operator as University of Worcester. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Henwick Grove - Solar Panels approved and built?

The application was submitted on 2021-09-03. Permission was granted on 2022-01-07, 4 months later. The site became operational on 2021-11-28.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9629.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council