Renewable sites › The Haven
The Haven
The Haven is operational in Malvern Hills with a recorded capacity of 1.2 MW, and has been generating since 2003-11-05.
Planning and build timeline
| Application submitted | 2002-12-18 |
| Permission granted | 2003-02-20 2 months after submission |
| Operational | 2003-11-05 8 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hangmans Lane EfW Incineration · Under Construction | 5 | 6.2 km |
Otherton Farm Solar Photovoltaics · Operational | 4 | 6.7 km |
Henwick Grove - Solar Panels Solar Photovoltaics · Operational | — | 9.2 km |
Croome Airfield Solar Farm Solar Photovoltaics · Operational | 49.9 | 12 km |
Norton Fields Farm Wind Onshore · Operational | 1.3 | 12.7 km |
Glebe Farm Solar Farm Solar Photovoltaics · Operational | 32 | 13.3 km |
Lower Strensham, Bourne Road (Extension) Solar Photovoltaics · Operational | 8 | 13.5 km |
How big is The Haven?
The Haven has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Haven?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Haven approved and built?
The application was submitted on 2002-12-18. Permission was granted on 2003-02-20, 2 months later. The site became operational on 2003-11-05, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3179.
Novarly Parcel · official public data, read properly · parcel.novarly.com