Novarly ParcelRenewable sites

Renewable sitesMoog Controls Factory

Moog Controls Factory

Moog Controls Factory is operational in Tewkesbury with a recorded capacity of 0.38 MW, and has been generating since 2019-09-13.

0.38 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-09-13
Solar Photovoltaics
Technology
Moog Controls
Tewkesbury
Authority
England

Planning and build timeline

Application submitted2018-11-23
Permission granted2021-01-11
26 months after submission
Operational2019-09-13

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tewkesbury’s record on solar

Tewkesbury has decided 24 solar farms and approved 92%, taking a median of 5.5 months. See every solar farm decision in Tewkesbury

Other built sites within 15 km

SiteMWDistance
Troughton Farm
Solar Photovoltaics · Operational
304.5 km
Wingmoor Farm (Waste AD)
Anaerobic Digestion · Operational
1.66.2 km
Home Farm
Solar Photovoltaics · Operational
6.77.2 km
Lower Stanley Farm
Solar Photovoltaics · Operational
48.1 km
Glebe Farm Solar Farm
Solar Photovoltaics · Operational
328.3 km
Lower Strensham, Bourne Road (Extension)
Solar Photovoltaics · Operational
88.5 km
Croome Airfield Solar Farm
Solar Photovoltaics · Operational
49.910.4 km
Safran Landing Systems Service
Biomass (dedicated) · Operational
3.612 km

How big is Moog Controls Factory?

Moog Controls Factory has a recorded installed capacity of 0.38 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Moog Controls Factory?

REPD records the operator as Moog Controls. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Moog Controls Factory approved and built?

The application was submitted on 2018-11-23. Permission was granted on 2021-01-11, 26 months later. The site became operational on 2019-09-13.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6816.

Novarly Parcel · official public data, read properly · parcel.novarly.com