Hall Farm Routh is operational in East Riding of Yorkshire with a recorded capacity of 24.6 MW, and has been generating since 2013-05-28.

24.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-05-28
Wind Onshore
Technology
John Laing Environmental Assets Group/REG Power Management
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2006-10-25
Permission granted2009-02-17
28 months after submission
Operational2013-05-28
51 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on onshore wind

East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Normandy Barracks
Solar Photovoltaics · Under Construction
2.35.2 km
Carlam Hill Education CIC
Solar Photovoltaics · Operational
57.8 km
Pillswood Phase 2
Battery · Operational
49.58.8 km
Pillswood Phase 1
Battery · Operational
49.58.8 km
Creyke Beck
Battery · Operational
49.99.3 km
Withernwick
Wind Onshore · Operational
1812.8 km
Cottingham - Solar Farm
Solar Photovoltaics · Operational
512.9 km
Withernwick extension
Wind Onshore · Operational
8.212.9 km

How big is Hall Farm Routh?

Hall Farm Routh has a recorded installed capacity of 24.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hall Farm Routh?

REPD records the operator as John Laing Environmental Assets Group/REG Power Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hall Farm Routh approved and built?

The application was submitted on 2006-10-25. Permission was granted on 2009-02-17, 28 months later. The site became operational on 2013-05-28, 51 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3948.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council