Renewable sites › Carlam Hill Education CIC
Carlam Hill Education CIC
Carlam Hill Education CIC is operational in Kingston upon Hull, City of with a recorded capacity of 5 MW, and has been generating since 2016-06-24.
Planning and build timeline
| Application submitted | 2015-04-23 |
| Permission granted | 2015-06-12 2 months after submission |
| Operational | 2016-06-24 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Kingston upon Hull, City of’s record on solar
Kingston upon Hull, City of has decided 23 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Kingston upon Hull, City of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Energy Works (Hull) Advanced Conversion Technologies · Operational | 25 | 5.6 km |
Energy Works Hull - AD (Waste AD) Anaerobic Digestion · Operational | 3 | 5.6 km |
Energy Works Hull - Wind Turbine Wind Onshore · Operational | 3 | 5.6 km |
Hull Solar Farm Solar Photovoltaics · Under Construction | 25.7 | 6.4 km |
Pillswood Phase 1 Battery · Operational | 49.5 | 6.6 km |
Pillswood Phase 2 Battery · Operational | 49.5 | 6.7 km |
Samaritans Spring Bank Solar Panels Solar Photovoltaics · Operational | — | 7 km |
Creyke Beck Battery · Operational | 49.9 | 7 km |
How big is Carlam Hill Education CIC?
Carlam Hill Education CIC has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carlam Hill Education CIC?
REPD records the operator as Greencoat (formerly Renesola). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carlam Hill Education CIC approved and built?
The application was submitted on 2015-04-23. Permission was granted on 2015-06-12, 2 months later. The site became operational on 2016-06-24, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4804.