Renewable sites › Normandy Barracks
Normandy Barracks
Normandy Barracks is a 2.3 MW solar farm under construction in East Riding of Yorkshire. REPD does not record the planning grant date. Operator of record: Ministry of Defence.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
East Riding of Yorkshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Normandy Barracks’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Riding of Yorkshire’s record on solar
East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 24.6 | 5.2 km |
Battery · Operational | 49.5 | 8.3 km |
Battery · Operational | 49.5 | 8.4 km |
Battery · Operational | 49.9 | 8.7 km |
Solar Photovoltaics · Operational | 5 | 11 km |
Wind Onshore · Operational | 15 | 11.3 km |
Wind Onshore · Operational | 10 | 11.7 km |
Solar Photovoltaics · Operational | 5 | 11.8 km |
How big is Normandy Barracks?
Normandy Barracks has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Normandy Barracks?
REPD records the operator as Ministry of Defence. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Normandy Barracks approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7818.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode