Normandy Barracks

Normandy Barracks is under construction in East Riding of Yorkshire with a recorded capacity of 2.3 MW.

2.3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Ministry of Defence
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on solar

East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Hall Farm Routh
Wind Onshore · Operational
24.65.2 km
Pillswood Phase 2
Battery · Operational
49.58.3 km
Pillswood Phase 1
Battery · Operational
49.58.4 km
Creyke Beck
Battery · Operational
49.98.7 km
Carlam Hill Education CIC
Solar Photovoltaics · Operational
511 km
Sober Hill Wind Farm
Wind Onshore · Operational
1511.3 km
Sancton Hill
Wind Onshore · Operational
1011.7 km
Cottingham - Solar Farm
Solar Photovoltaics · Operational
511.8 km

How big is Normandy Barracks?

Normandy Barracks has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Normandy Barracks?

REPD records the operator as Ministry of Defence. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Normandy Barracks approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7818.