Gosfield Airfield

Gosfield Airfield is operational in Braintree with a recorded capacity of 12.6 MW, and has been generating since 2015-02-01.

12.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-02-01
Solar Photovoltaics
Technology
Push Energy
Braintree
Authority
England

Planning and build timeline

Application submitted2013-12-23
Permission granted2014-04-17
4 months after submission
Operational2015-02-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on solar

Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree

Other built sites within 15 km

SiteMWDistance
Halstead Renewable Power Project (Waste AD)
Anaerobic Digestion · Operational
25.6 km
Kentishes Solar Farm
Solar Photovoltaics · Operational
55.8 km
Braintree Road, Cressing - Battery Storage
Battery · Under Construction
578.9 km
Four Elms Solar Array
Solar Photovoltaics · Operational
0.179 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Battery · Operational
10.6 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Solar Photovoltaics · Operational
3510.6 km
Cutbush Farm, Belchamp St Paul - Solar Array
Solar Photovoltaics · Under Construction
49.9910.9 km
Land west of Hawkspur Green (Hill Hall Solar)
Solar Photovoltaics · Operational
4.912.1 km

How big is Gosfield Airfield?

Gosfield Airfield has a recorded installed capacity of 12.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gosfield Airfield?

REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gosfield Airfield approved and built?

The application was submitted on 2013-12-23. Permission was granted on 2014-04-17, 4 months later. The site became operational on 2015-02-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1912.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council