Gosfield Airfield

Gosfield Airfield is an operational 12.6 MW solar farm in Braintree, generating since 1 February 2015. Planning permission was granted on 17 April 2014, 4 months after submission. Operator of record: Push Energy.

12.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2015
Solar Photovoltaics
Technology
Push Energy
Braintree
Authority
England

Planning and build timeline

Application submitted23 December 2013
Permission granted17 April 2014
4 months after submission
Operational1 February 2015
10 months after consent

Screening a site of your own?

RedlineUK · £39

Braintree approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gosfield Airfield’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on solar

Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
25.6 km
Solar Photovoltaics · Operational
55.8 km
Battery · Under Construction
578.9 km
Solar Photovoltaics · Operational
0.179 km
Solar Photovoltaics · Operational
3510.6 km
Battery · Operational
10.6 km
Solar Photovoltaics · Under Construction
49.9910.9 km
Solar Photovoltaics · Operational
4.912.1 km

How big is Gosfield Airfield?

Gosfield Airfield has a recorded installed capacity of 12.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gosfield Airfield?

REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gosfield Airfield approved and built?

The application was submitted on 23 December 2013. Permission was granted on 17 April 2014, 4 months later. The site became operational on 1 February 2015, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1912.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode