Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage is an operational 35 MW solar farm in Braintree, generating since 1 October 2024. Planning permission was granted on 23 December 2021, 6 months after submission. Operator of record: Low Carbon Limited.
Planning and build timeline
| Application submitted | 9 June 2021 |
| Permission granted | 23 December 2021 6 months after submission |
| Operational | 1 October 2024 33 months after consent |
Screening a site of your own?
Braintree approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Periwinkle Hall - Links Solar photovoltaic farm & Battery storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Braintree’s record on solar
Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | — | 0 km |
Anaerobic Digestion · Under Construction | 1.8 | 2 km |
EfW Incineration · Under Construction | 49.8 | 2 km |
Solar Photovoltaics · Operational | 5 | 3.1 km |
Battery · Under Construction | 57 | 3.7 km |
Solar Photovoltaics · Operational | 5 | 4.8 km |
Solar Photovoltaics · Operational | 0.19 | 6.2 km |
Battery · Under Construction | 10 | 7.1 km |
How big is Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage has a recorded installed capacity of 35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?
REPD records the operator as Low Carbon Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Periwinkle Hall - Links Solar photovoltaic farm & Battery storage approved and built?
The application was submitted on 9 June 2021. Permission was granted on 23 December 2021, 6 months later. The site became operational on 1 October 2024, 33 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9282.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode