Novarly ParcelRenewable sites

Renewable sitesPeriwinkle Hall - Links Solar photovoltaic farm & Battery storage

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage is an operational battery storage site in Braintree, generating since 1 October 2024. Planning permission was granted on 23 December 2021, 6 months after submission. Operator of record: Low Carbon Limited.

Capacity
as recorded in REPD
Operational
Status
since 1 October 2024
Battery
Technology
Low Carbon Limited
Braintree
Authority
England

Planning and build timeline

Application submitted9 June 2021
Permission granted23 December 2021
6 months after submission
Operational1 October 2024
33 months after consent

Screening a site of your own?

RedlineUK · £39

Braintree approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Periwinkle Hall - Links Solar photovoltaic farm & Battery storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on battery storage

Braintree has decided 8 battery storage schemes and approved 100%, taking a median of 3.9 months. See every battery storage scheme decision in Braintree

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
350 km
Anaerobic Digestion · Under Construction
1.82 km
EfW Incineration · Under Construction
49.82 km
Solar Photovoltaics · Operational
53.1 km
Battery · Under Construction
573.7 km
Solar Photovoltaics · Operational
54.8 km
Solar Photovoltaics · Operational
0.196.2 km
Battery · Under Construction
107.1 km

How big is Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?

REPD does not record an installed capacity for Periwinkle Hall - Links Solar photovoltaic farm & Battery storage.

Who operates Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?

REPD records the operator as Low Carbon Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Periwinkle Hall - Links Solar photovoltaic farm & Battery storage approved and built?

The application was submitted on 9 June 2021. Permission was granted on 23 December 2021, 6 months later. The site became operational on 1 October 2024, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9283.