Novarly ParcelRenewable sites

Renewable sitesHalstead Renewable Power Project (Waste AD)

Halstead Renewable Power Project (Waste AD)

Halstead Renewable Power Project (Waste AD) is operational in Braintree with a recorded capacity of 2 MW, and has been generating since 2014-07-01.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-01
Anaerobic Digestion
Technology
Biogen (formerly Tamar Energy)
Braintree
Authority
England

Planning and build timeline

Application submitted2010-07-16
Permission granted2010-08-20
1 months after submission
Operational2014-07-01
46 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Kentishes Solar Farm
Solar Photovoltaics · Operational
55.5 km
Gosfield Airfield
Solar Photovoltaics · Operational
12.65.6 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Battery · Operational
8.9 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Solar Photovoltaics · Operational
358.9 km
Braintree Road, Cressing - Battery Storage
Battery · Under Construction
579.4 km
Wren Power and Pulp (Rivenhall Airfield)
EfW Incineration · Under Construction
49.89.9 km
Wren Power and Pulp (Rivenhall Airfield)
Anaerobic Digestion · Under Construction
1.89.9 km
Cressing Solar Farm (Phase 1)
Solar Photovoltaics · Operational
511.9 km

How big is Halstead Renewable Power Project (Waste AD)?

Halstead Renewable Power Project (Waste AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Halstead Renewable Power Project (Waste AD)?

REPD records the operator as Biogen (formerly Tamar Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Halstead Renewable Power Project (Waste AD) approved and built?

The application was submitted on 2010-07-16. Permission was granted on 2010-08-20, 1 months later. The site became operational on 2014-07-01, 46 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 313.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council