Braintree Road, Cressing - Battery Storage

Braintree Road, Cressing - Battery Storage is a 57 MW battery storage site under construction in Braintree. Planning permission was granted on 1 September 2023, 12 months after submission. Operator of record: Pivot Power (EDF Renewables).

57 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Pivot Power (EDF Renewables)
Braintree
Authority
England

Planning and build timeline

Application submitted17 August 2022
Permission granted1 September 2023
12 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Braintree approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Braintree Road, Cressing - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on battery storage

Braintree has decided 8 battery storage schemes and approved 100%, taking a median of 3.9 months. See every battery storage scheme decision in Braintree

Other built sites within 15 km

SiteMWDistance
Battery · Operational
3.7 km
Solar Photovoltaics · Operational
353.7 km
Solar Photovoltaics · Operational
53.9 km
Solar Photovoltaics · Operational
54.3 km
Battery · Under Construction
104.4 km
Anaerobic Digestion · Under Construction
1.85.6 km
EfW Incineration · Under Construction
49.85.6 km
Solar Photovoltaics · Operational
65.6 km

How big is Braintree Road, Cressing - Battery Storage?

Braintree Road, Cressing - Battery Storage has a recorded installed capacity of 57 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Braintree Road, Cressing - Battery Storage?

REPD records the operator as Pivot Power (EDF Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Braintree Road, Cressing - Battery Storage approved and built?

The application was submitted on 17 August 2022. Permission was granted on 1 September 2023, 12 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11995.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode