Novarly ParcelRenewable sites

Renewable sitesKentishes Solar Farm

Kentishes Solar Farm

Kentishes Solar Farm is operational in Braintree with a recorded capacity of 5 MW, and has been generating since 2016-12-13.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-13
Solar Photovoltaics
Technology
Push Energy/ NextEnergy Solar Fund (NESF)
Braintree
Authority
England

Planning and build timeline

Application submitted2014-11-05
Permission granted2016-04-08
17 months after submission
Operational2016-12-13
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Braintree’s record on solar

Braintree has decided 23 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Braintree

Other built sites within 15 km

SiteMWDistance
Braintree Road, Cressing - Battery Storage
Battery · Under Construction
573.9 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Solar Photovoltaics · Operational
354.8 km
Periwinkle Hall - Links Solar photovoltaic farm & Battery storage
Battery · Operational
4.8 km
Halstead Renewable Power Project (Waste AD)
Anaerobic Digestion · Operational
25.5 km
Gosfield Airfield
Solar Photovoltaics · Operational
12.65.8 km
Wren Power and Pulp (Rivenhall Airfield)
EfW Incineration · Under Construction
49.86.6 km
Wren Power and Pulp (Rivenhall Airfield)
Anaerobic Digestion · Under Construction
1.86.6 km
Cressing Solar Farm (Phase 1)
Solar Photovoltaics · Operational
57.2 km

How big is Kentishes Solar Farm?

Kentishes Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kentishes Solar Farm?

REPD records the operator as Push Energy/ NextEnergy Solar Fund (NESF). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kentishes Solar Farm approved and built?

The application was submitted on 2014-11-05. Permission was granted on 2016-04-08, 17 months later. The site became operational on 2016-12-13, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1464.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council