FMC Technologies is an operational 1.5 MW onshore wind farm in Fife, generating since 7 December 2011. Planning permission was granted on 22 December 2009, 10 months after submission. Operator of record: FMC Technologies.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 7 December 2011
Wind Onshore
Technology
FMC Technologies
Fife
Authority
Scotland

Planning and build timeline

Application submitted12 February 2009
Permission granted22 December 2009
10 months after submission
Operational7 December 2011
23 months after consent

Screening a site of your own?

RedlineUK · £39

Fife approves 54% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with FMC Technologies’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fife’s record on onshore wind

Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.50.3 km
Solar Photovoltaics · Operational
1.93.6 km
Anaerobic Digestion · Operational
1.74.7 km
Solar Photovoltaics · Operational
0.24.7 km
Battery · Under Construction
204.9 km
Solar Photovoltaics · Under Construction
29.94.9 km
Landfill Gas · Operational
25 km
Wind Onshore · Operational
28.5 km

How big is FMC Technologies?

FMC Technologies has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates FMC Technologies?

REPD records the operator as FMC Technologies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was FMC Technologies approved and built?

The application was submitted on 12 February 2009. Permission was granted on 22 December 2009, 10 months later. The site became operational on 7 December 2011, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2687.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode