Renewable sitesDunfermline North - Solar Photovoltaic Array/Battery storage

Dunfermline North - Solar Photovoltaic Array/Battery storage

Dunfermline North - Solar Photovoltaic Array/Battery storage is a 29.9 MW solar farm under construction in Fife. Planning permission was granted on 23 June 2023, 14 months after submission. Operator of record: Dunfermline Solar Limited (AMPYR Solar Europe).

29.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Dunfermline Solar Limited (AMPYR Solar Europe)
Fife
Authority
Scotland

Planning and build timeline

Application submitted26 April 2022
Permission granted23 June 2023
14 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Fife approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dunfermline North - Solar Photovoltaic Array/Battery storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
200 km
Anaerobic Digestion · Operational
1.70.4 km
Landfill Gas · Operational
20.5 km
Wind Onshore · Operational
1.54.9 km
Wind Onshore · Operational
1.55.2 km
Solar Photovoltaics · Operational
1.96.1 km
Wind Onshore · Operational
29.1 km
Wind Onshore · Operational
4.69.2 km

How big is Dunfermline North - Solar Photovoltaic Array/Battery storage?

Dunfermline North - Solar Photovoltaic Array/Battery storage has a recorded installed capacity of 29.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dunfermline North - Solar Photovoltaic Array/Battery storage?

REPD records the operator as Dunfermline Solar Limited (AMPYR Solar Europe). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dunfermline North - Solar Photovoltaic Array/Battery storage approved and built?

The application was submitted on 26 April 2022. Permission was granted on 23 June 2023, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11263.