Dunfermline North - Solar Photovoltaic Array/Battery storage

Dunfermline North - Solar Photovoltaic Array/Battery storage is under construction in Fife with a recorded capacity of 29.9 MW.

29.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Dunfermline Solar Limited (AMPYR Solar Europe)
Fife
Authority
Scotland

Planning and build timeline

Application submitted2022-04-26
Permission granted2023-06-23
14 months after submission
Operationalnot recorded

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Dunfermline North - Solar Photovoltaic Array/Battery storage
Battery · Under Construction
200 km
Lochhead Landfill CHP
Anaerobic Digestion · Operational
1.70.4 km
Lochhead
Landfill Gas · Operational
20.5 km
FMC Technologies
Wind Onshore · Operational
1.54.9 km
F M C Land, Pitreavie Business Park
Wind Onshore · Operational
1.55.2 km
Dunfermline EDI4
Solar Photovoltaics · Operational
1.96.1 km
Goathill Quarry Turbine
Wind Onshore · Operational
29.1 km
Mossmorran Wind Farm
Wind Onshore · Operational
4.69.2 km

How big is Dunfermline North - Solar Photovoltaic Array/Battery storage?

Dunfermline North - Solar Photovoltaic Array/Battery storage has a recorded installed capacity of 29.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dunfermline North - Solar Photovoltaic Array/Battery storage?

REPD records the operator as Dunfermline Solar Limited (AMPYR Solar Europe). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dunfermline North - Solar Photovoltaic Array/Battery storage approved and built?

The application was submitted on 2022-04-26. Permission was granted on 2023-06-23, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11263.