Lochhead
Lochhead is an operational 2 MW landfill gas site in Fife, generating since 1 September 2006. REPD does not record the planning grant date. Operator of record: Fife Council.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 September 2006 |
Screening a site of your own?
Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lochhead’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.7 | 0.3 km |
Battery · Under Construction | 20 | 0.5 km |
Solar Photovoltaics · Under Construction | 29.9 | 0.5 km |
Wind Onshore · Operational | 1.5 | 5 km |
Wind Onshore · Operational | 1.5 | 5.3 km |
Solar Photovoltaics · Operational | 1.9 | 6.4 km |
Wind Onshore · Operational | 2 | 9.6 km |
Solar Photovoltaics · Operational | 0.2 | 9.6 km |
How big is Lochhead?
Lochhead has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lochhead?
REPD records the operator as Fife Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lochhead approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 September 2006.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 683.