Renewable sites › Dunfermline North - Solar Photovoltaic Array/Battery storage
Dunfermline North - Solar Photovoltaic Array/Battery storage
Dunfermline North - Solar Photovoltaic Array/Battery storage is a 20 MW battery storage site under construction in Fife. Planning permission was granted on 23 June 2023, 14 months after submission. Operator of record: Dunfermline Solar Limited (AMPYR Solar Europe).
Planning and build timeline
| Application submitted | 26 April 2022 |
| Permission granted | 23 June 2023 14 months after submission |
| Operational | not recorded |
Screening a site of your own?
Fife approves 96% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Dunfermline North - Solar Photovoltaic Array/Battery storage’s recorded coordinate — swap in your own postcode or coordinates.
Fife’s record on battery storage
Fife has decided 23 battery storage schemes and approved 96%, taking a median of 3.9 months. See every battery storage scheme decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 29.9 | 0 km |
Anaerobic Digestion · Operational | 1.7 | 0.4 km |
Landfill Gas · Operational | 2 | 0.5 km |
Wind Onshore · Operational | 1.5 | 4.9 km |
Wind Onshore · Operational | 1.5 | 5.2 km |
Solar Photovoltaics · Operational | 1.9 | 6.1 km |
Wind Onshore · Operational | 2 | 9.1 km |
Wind Onshore · Operational | 4.6 | 9.2 km |
How big is Dunfermline North - Solar Photovoltaic Array/Battery storage?
Dunfermline North - Solar Photovoltaic Array/Battery storage has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dunfermline North - Solar Photovoltaic Array/Battery storage?
REPD records the operator as Dunfermline Solar Limited (AMPYR Solar Europe). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dunfermline North - Solar Photovoltaic Array/Battery storage approved and built?
The application was submitted on 26 April 2022. Permission was granted on 23 June 2023, 14 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11264.