St Margarets Bay
St Margarets Bay is operational in Fife with a recorded capacity of 0.2 MW, and has been generating since 2020-03-31.
Planning and build timeline
| Application submitted | 2019-02-08 |
| Permission granted | 2019-04-26 3 months after submission |
| Operational | 2020-03-31 11 months after consent |
Fife’s record on solar
Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
F M C Land, Pitreavie Business Park Wind Onshore · Operational | 1.5 | 4.4 km |
FMC Technologies Wind Onshore · Operational | 1.5 | 4.7 km |
Dunfermline EDI4 Solar Photovoltaics · Operational | 1.9 | 5.1 km |
Goathill Quarry Turbine Wind Onshore · Operational | 2 | 9.3 km |
Lochhead Landfill CHP Anaerobic Digestion · Operational | 1.7 | 9.4 km |
Dunfermline North - Solar Photovoltaic Array/Battery storage Solar Photovoltaics · Under Construction | 29.9 | 9.6 km |
Dunfermline North - Solar Photovoltaic Array/Battery storage Battery · Under Construction | 20 | 9.6 km |
Lochhead Landfill Gas · Operational | 2 | 9.6 km |
How big is St Margarets Bay?
St Margarets Bay has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates St Margarets Bay?
REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was St Margarets Bay approved and built?
The application was submitted on 2019-02-08. Permission was granted on 2019-04-26, 3 months later. The site became operational on 2020-03-31, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7267.