Renewable sitesGreat Western Air Ambulance Charity - Solar Panels

Great Western Air Ambulance Charity - Solar Panels

Great Western Air Ambulance Charity - Solar Panels is an operational 0.25 MW solar farm in Bristol, City of, generating since 1 August 2024. REPD does not record the planning grant date. Operator of record: Bristol Energy Cooperative.

0.25 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2024
Solar Photovoltaics
Technology
Bristol Energy Cooperative
Bristol, City of
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 August 2024

Screening a site of your own?

RedlineUK · £39

Bristol, City of approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Great Western Air Ambulance Charity - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on solar

Bristol, City of has decided 18 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
1.051.2 km
Battery · Operational
204.5 km
Battery · Operational
156.4 km
Solar Photovoltaics · Operational
4.28.3 km
Wind Onshore · Operational
98.6 km
Wind Onshore · Operational
8.28.6 km
Solar Photovoltaics · Under Construction
3.818.6 km
Solar Photovoltaics · Operational
1.88.6 km

How big is Great Western Air Ambulance Charity - Solar Panels?

Great Western Air Ambulance Charity - Solar Panels has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Western Air Ambulance Charity - Solar Panels?

REPD records the operator as Bristol Energy Cooperative. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Western Air Ambulance Charity - Solar Panels approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 August 2024.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16871.