Renewable sites › Great Western Air Ambulance Charity - Solar Panels
Great Western Air Ambulance Charity - Solar Panels
Great Western Air Ambulance Charity - Solar Panels is operational in Bristol, City of with a recorded capacity of 0.25 MW, and has been generating since 2024-08-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2024-08-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bristol, City of’s record on solar
Bristol, City of has decided 18 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Bristol, City of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Epic Long Ashton, Phase 1 - 3 Office Buildings Solar Photovoltaics · Under Construction | 1.05 | 1.2 km |
Feeder Road Battery · Operational | 20 | 4.5 km |
Lockleaze Energy Storage Battery · Operational | 15 | 6.4 km |
Avonmouth Solar Photovoltaics · Operational | 4.2 | 8.3 km |
Avonmouth Port - extension Wind Onshore · Operational | 9 | 8.6 km |
Avonmouth Wind Power Wind Onshore · Operational | 8.2 | 8.6 km |
Moorhouse Farm, Moorhouse Lane - Solar Park Solar Photovoltaics · Under Construction | 3.81 | 8.6 km |
Moorhouse Lane Solar Photovoltaics · Operational | 1.8 | 8.6 km |
How big is Great Western Air Ambulance Charity - Solar Panels?
Great Western Air Ambulance Charity - Solar Panels has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Great Western Air Ambulance Charity - Solar Panels?
REPD records the operator as Bristol Energy Cooperative. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Great Western Air Ambulance Charity - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2024-08-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16871.
Novarly Parcel · official public data, read properly · parcel.novarly.com