Novarly ParcelRenewable sites

Renewable sitesGreat Western Air Ambulance Charity - Solar Panels

Great Western Air Ambulance Charity - Solar Panels

Great Western Air Ambulance Charity - Solar Panels is operational in Bristol, City of with a recorded capacity of 0.25 MW, and has been generating since 2024-08-01.

0.25 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-08-01
Solar Photovoltaics
Technology
Bristol Energy Cooperative
Bristol, City of
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2024-08-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on solar

Bristol, City of has decided 18 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Epic Long Ashton, Phase 1 - 3 Office Buildings
Solar Photovoltaics · Under Construction
1.051.2 km
Feeder Road
Battery · Operational
204.5 km
Lockleaze Energy Storage
Battery · Operational
156.4 km
Avonmouth
Solar Photovoltaics · Operational
4.28.3 km
Avonmouth Port - extension
Wind Onshore · Operational
98.6 km
Avonmouth Wind Power
Wind Onshore · Operational
8.28.6 km
Moorhouse Farm, Moorhouse Lane - Solar Park
Solar Photovoltaics · Under Construction
3.818.6 km
Moorhouse Lane
Solar Photovoltaics · Operational
1.88.6 km

How big is Great Western Air Ambulance Charity - Solar Panels?

Great Western Air Ambulance Charity - Solar Panels has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Western Air Ambulance Charity - Solar Panels?

REPD records the operator as Bristol Energy Cooperative. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Western Air Ambulance Charity - Solar Panels approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2024-08-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16871.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council