Rolls Royce Filton Campus Building 185
Rolls Royce Filton Campus Building 185 is an operational 1.8 MW solar farm in South Gloucestershire, generating since 15 August 2016. Planning permission was granted on 23 March 2016, 2 months after submission. Operator of record: Innogy (previously BELECTRIC Solar).
Planning and build timeline
| Application submitted | 29 January 2016 |
| Permission granted | 23 March 2016 2 months after submission |
| Operational | 15 August 2016 5 months after consent |
Screening a site of your own?
South Gloucestershire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rolls Royce Filton Campus Building 185’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Gloucestershire’s record on solar
South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.4 | 0 km |
Solar Photovoltaics · Operational | 8 | 2.4 km |
Solar Photovoltaics · Operational | 1.7 | 3.1 km |
Solar Photovoltaics · Operational | 15 | 3.2 km |
Solar Photovoltaics · Operational | 21 | 3.8 km |
Solar Photovoltaics · Operational | 4.6 | 3.9 km |
Battery · Operational | 15 | 4.4 km |
Solar Photovoltaics · Under Construction | 49.9 | 5.7 km |
How big is Rolls Royce Filton Campus Building 185?
Rolls Royce Filton Campus Building 185 has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rolls Royce Filton Campus Building 185?
REPD records the operator as Innogy (previously BELECTRIC Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rolls Royce Filton Campus Building 185 approved and built?
The application was submitted on 29 January 2016. Permission was granted on 23 March 2016, 2 months later. The site became operational on 15 August 2016, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6043.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode