Epic Long Ashton, Phase 1 - 3 Office Buildings
Epic Long Ashton, Phase 1 - 3 Office Buildings is under construction in North Somerset with a recorded capacity of 1.05 MW.
Planning and build timeline
| Application submitted | 2023-10-30 |
| Permission granted | 2025-03-06 16 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Conservation area — Long Ashton
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Somerset’s record on solar
North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Great Western Air Ambulance Charity - Solar Panels Solar Photovoltaics · Operational | 0.25 | 1.2 km |
Feeder Road Battery · Operational | 20 | 5.7 km |
Lockleaze Energy Storage Battery · Operational | 15 | 7.4 km |
Bristol Airport Solar Farm Solar Photovoltaics · Under Construction | — | 7.6 km |
Nailsea Rescue Centre, Nailsea - Solar Panels Solar Photovoltaics · Operational | — | 8.3 km |
Avonmouth Port - extension Wind Onshore · Operational | 9 | 8.3 km |
Avonmouth Solar Photovoltaics · Operational | 4.2 | 8.4 km |
Avonmouth Wind Power Wind Onshore · Operational | 8.2 | 8.6 km |
How big is Epic Long Ashton, Phase 1 - 3 Office Buildings?
Epic Long Ashton, Phase 1 - 3 Office Buildings has a recorded installed capacity of 1.05 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Epic Long Ashton, Phase 1 - 3 Office Buildings?
REPD records the operator as Epic Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Epic Long Ashton, Phase 1 - 3 Office Buildings approved and built?
The application was submitted on 2023-10-30. Permission was granted on 2025-03-06, 16 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15340.