Novarly ParcelRenewable sites

Renewable sitesEpic Long Ashton, Phase 1 - 3 Office Buildings

Epic Long Ashton, Phase 1 - 3 Office Buildings

Epic Long Ashton, Phase 1 - 3 Office Buildings is under construction in North Somerset with a recorded capacity of 1.05 MW.

1.05 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Epic Systems
North Somerset
Authority
England

Planning and build timeline

Application submitted2023-10-30
Permission granted2025-03-06
16 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Somerset’s record on solar

North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset

Other built sites within 15 km

SiteMWDistance
Great Western Air Ambulance Charity - Solar Panels
Solar Photovoltaics · Operational
0.251.2 km
Feeder Road
Battery · Operational
205.7 km
Lockleaze Energy Storage
Battery · Operational
157.4 km
Bristol Airport Solar Farm
Solar Photovoltaics · Under Construction
7.6 km
Nailsea Rescue Centre, Nailsea - Solar Panels
Solar Photovoltaics · Operational
8.3 km
Avonmouth Port - extension
Wind Onshore · Operational
98.3 km
Avonmouth
Solar Photovoltaics · Operational
4.28.4 km
Avonmouth Wind Power
Wind Onshore · Operational
8.28.6 km

How big is Epic Long Ashton, Phase 1 - 3 Office Buildings?

Epic Long Ashton, Phase 1 - 3 Office Buildings has a recorded installed capacity of 1.05 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Epic Long Ashton, Phase 1 - 3 Office Buildings?

REPD records the operator as Epic Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Epic Long Ashton, Phase 1 - 3 Office Buildings approved and built?

The application was submitted on 2023-10-30. Permission was granted on 2025-03-06, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15340.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council