Rolls Royce Filton Campus Building 184 is operational in South Gloucestershire with a recorded capacity of 1.4 MW, and has been generating since 2016-08-15.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-08-15
Solar Photovoltaics
Technology
Innogy (previously BELECTRIC Solar)
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2016-01-29
Permission granted2016-03-23
2 months after submission
Operational2016-08-15
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Gloucestershire’s record on solar

South Gloucestershire has decided 54 solar farms and approved 96%, taking a median of 1.8 months. See every solar farm decision in South Gloucestershire

Other built sites within 15 km

SiteMWDistance
Rolls Royce Filton Campus Building 185
Solar Photovoltaics · Operational
1.80 km
Oakham Farm
Solar Photovoltaics · Operational
82.4 km
Amcor Flexibles
Solar Photovoltaics · Operational
1.73.1 km
Hammond Court Farm
Solar Photovoltaics · Operational
153.2 km
Grange Farm (Avon)
Solar Photovoltaics · Operational
213.8 km
Parklands
Solar Photovoltaics · Operational
4.63.9 km
Lockleaze Energy Storage
Battery · Operational
154.4 km
Perrinpit Farm
Solar Photovoltaics · Under Construction
49.95.7 km

How big is Rolls Royce Filton Campus Building 184?

Rolls Royce Filton Campus Building 184 has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rolls Royce Filton Campus Building 184?

REPD records the operator as Innogy (previously BELECTRIC Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rolls Royce Filton Campus Building 184 approved and built?

The application was submitted on 2016-01-29. Permission was granted on 2016-03-23, 2 months later. The site became operational on 2016-08-15, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6042.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council