Novarly ParcelRenewable sites

Renewable sitesAvonmouth Wind Power

Avonmouth Wind Power

Avonmouth Wind Power is an operational 8.2 MW onshore wind farm in Bristol, City of, generating since 6 February 2014. Planning permission was granted on 25 March 2009, 4 months after submission. Operator of record: Wessex Water Engineering Services.

8.2 MW
Capacity
as recorded in REPD
Operational
Status
since 6 February 2014
Wind Onshore
Technology
Wessex Water Engineering Services
Bristol, City of
Authority
England

Planning and build timeline

Application submitted8 December 2008
Permission granted25 March 2009
4 months after submission
Operational6 February 2014
58 months after consent

Screening a site of your own?

RedlineUK · £39

Bristol, City of approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Avonmouth Wind Power’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bristol, City of’s record on onshore wind

Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
100.3 km
Solar Photovoltaics · Operational
4.20.5 km
Solar Photovoltaics · Operational
1.81.2 km
Solar Photovoltaics · Under Construction
3.811.2 km
Battery · Operational
321.2 km
Advanced Conversion Technologies · Operational
6.51.2 km
Advanced Conversion Technologies · Operational
6.51.2 km
Wind Onshore · Operational
2.51.2 km

How big is Avonmouth Wind Power?

Avonmouth Wind Power has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Avonmouth Wind Power?

REPD records the operator as Wessex Water Engineering Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Avonmouth Wind Power approved and built?

The application was submitted on 8 December 2008. Permission was granted on 25 March 2009, 4 months later. The site became operational on 6 February 2014, 58 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3664.