Avonmouth Wind Power
Avonmouth Wind Power is operational in Bristol, City of with a recorded capacity of 8.2 MW, and has been generating since 2014-02-06.
Planning and build timeline
| Application submitted | 2008-12-08 |
| Permission granted | 2009-03-25 4 months after submission |
| Operational | 2014-02-06 58 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bristol, City of’s record on onshore wind
Bristol, City of has decided 6 onshore wind schemes and approved 100%, taking a median of 4.5 months. See every onshore wind scheme decision in Bristol, City of →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bristol STW (Waste AD) Anaerobic Digestion · Operational | 10 | 0.3 km |
Avonmouth Solar Photovoltaics · Operational | 4.2 | 0.5 km |
Moorhouse Lane Solar Photovoltaics · Operational | 1.8 | 1.2 km |
Moorhouse Farm, Moorhouse Lane - Solar Park Solar Photovoltaics · Under Construction | 3.81 | 1.2 km |
Severn Road Battery · Operational | 32 | 1.2 km |
Avonmouth Advanced Conversion Technologies · Operational | 6.5 | 1.2 km |
Avonmouth Low Carbon Energy Facility - Phase 2 Advanced Conversion Technologies · Operational | 6.5 | 1.2 km |
Accolade Wines Wind Onshore · Operational | 2.5 | 1.2 km |
How big is Avonmouth Wind Power?
Avonmouth Wind Power has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Avonmouth Wind Power?
REPD records the operator as Wessex Water Engineering Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Avonmouth Wind Power approved and built?
The application was submitted on 2008-12-08. Permission was granted on 2009-03-25, 4 months later. The site became operational on 2014-02-06, 58 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3664.