Nailsea Rescue Centre, Nailsea - Solar Panels is an operational solar farm in North Somerset, generating since 1 July 2021. Planning permission was granted on 6 August 2021, 3 months after submission. Operator of record: Avon Fire and Rescue Service.
Planning and build timeline
| Application submitted | 10 May 2021 |
| Permission granted | 6 August 2021 3 months after submission |
| Operational | 1 July 2021 |
Screening a site of your own?
North Somerset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Nailsea Rescue Centre, Nailsea - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Somerset’s record on solar
North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | — | 7 km |
Solar Photovoltaics · Under Construction | 2.93 | 7.3 km |
Solar Photovoltaics · Under Construction | 0.84 | 7.4 km |
Solar Photovoltaics · Under Construction | 1.05 | 8.3 km |
Wind Onshore · Operational | 9 | 8.5 km |
Solar Photovoltaics · Operational | 8 | 9 km |
Solar Photovoltaics · Operational | 1 | 9.2 km |
Wind Onshore · Operational | 6 | 9.3 km |
How big is Nailsea Rescue Centre, Nailsea - Solar Panels?
REPD does not record an installed capacity for Nailsea Rescue Centre, Nailsea - Solar Panels.
Who operates Nailsea Rescue Centre, Nailsea - Solar Panels?
REPD records the operator as Avon Fire and Rescue Service. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Nailsea Rescue Centre, Nailsea - Solar Panels approved and built?
The application was submitted on 10 May 2021. Permission was granted on 6 August 2021, 3 months later. The site became operational on 1 July 2021.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9043.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode