Novarly ParcelRenewable sites

Renewable sitesBristol Airport Solar Farm

Bristol Airport Solar Farm

Bristol Airport Solar Farm is a solar farm under construction in North Somerset. REPD does not record the planning grant date. Operator of record: Bristol Airport.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Bristol Airport
North Somerset
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

North Somerset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bristol Airport Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Somerset’s record on solar

North Somerset has decided 39 solar farms and approved 95%, taking a median of 2.9 months. See every solar farm decision in North Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
86.1 km
Solar Photovoltaics · Operational
16.4 km
Solar Photovoltaics · Operational
16.6 km
Solar Photovoltaics · Operational
7 km
Solar Photovoltaics · Under Construction
1.057.6 km
Solar Photovoltaics · Operational
7.18.6 km
Solar Photovoltaics · Under Construction
0.848.6 km
Solar Photovoltaics · Operational
0.258.6 km

How big is Bristol Airport Solar Farm?

REPD does not record an installed capacity for Bristol Airport Solar Farm.

Who operates Bristol Airport Solar Farm?

REPD records the operator as Bristol Airport. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bristol Airport Solar Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13920.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode